* Required Fields
Name Of Company *
Contact Name *
Phone Number *
Email Address
SIC Code
When is your desired move-in date?
Month Year
Where is the building to be located?
City State/Province Country
Check existing utilities located at site: Water Sewer Electric Gas Telecom
Distance of building to road: ft
Number of production/warehouse employees, all shifts:
Number working largest shift only:
Number of parking spaces required:
What is the end use of your building?
New construction area: sq ft
Existing construction area: sq ft
Renovations: sq ft
Finished office/administration area: sq ft
Finished production sq ft
Finished warehouse area: sq ft
Total completed building area (Wew and Existing): sq ft
Finished Building Dimensions:
Length ft
Width: ft
Height: ft
Will AECON obtain site plan approval? Yes No
What is the area of your site? acres
Will there be a mezzanine
(open 2nd story in shop area)?
Yes No
Floor Load: lbs
Clear Height: ft
Above: ft
Below: ft
Shop lighting level: Min. Reading Inspection Specialty
Special Concrete floor finish: Yes No
Nonskid Water & Oil Resistant Hardened Decorative/Specialty
Is an overhead crane is required? Yes No
Span: ft
Capacity: Tons
Run: ft
Is industrial equipment to be installed/moved? Yes No
Total Tonnage
Check special floor features: pit foundation platform shaped
Office space finish quality level of fixtures, hardware, paint and decor:
Economy Durable Commercial Custom/specialty
Number of windows desired:
Average window size: sq ft
Skylights: Yes No
Total square feet of Skylights
Are forklifts used in your building? Yes No
Number of Lifts: Per Day
Loaded Weight: lbs
Wheel Spacing: feet
Will there be racks in the production/ Warehouse space? Yes No
Will these racks be supplied and installed by the owner? Yes No
Loading Cap: per sq. ft.
Height: ft.
Shelf Spacing
Vertical: inch.
Horizontal: inch.
Are loading docks required? Yes No
How many:
levellers Seals ICC Restraints
Is the production/warehouse space heated? Yes No
What heated tempurature is required? ºF
Is the production/warehouse space cooled? Yes No
What cooled tempurature is required? ºF
Is humidity control required? Yes No
Required humidity range: % -- %
Total electrical power required: Amps Volts
Industrial process power required: Yes No 
Process Amps:
Process Volts:
About AECON
View AECON Projects
Download Case Studies
Estimate Your Project
Contact AECON
Home