Please use return the form below to get more information about our design/build, architectural and construction management services.
Be assured that we do not sell, rent, or share client information. We respect your privacy as much as we value your business.
All
highlighted
fields are required.
Contact Information
* Name of Company:
* Contact Name:
* Phone Number:
E-mail Address:
SIC Code:
Building Details
Desired move-in date:
January
February
March
April
May
June
July
August
September
October
November
December
2008
2009
2010
2011
2012
2013
Building Location:
City
State/Province
Country
Existing Utilities at Site:
Water
Sewer
Gas
Electric
Telecom
Distance of building to road:
ft.
Number of employees:
Production and warehouse employees
employees
Employees on Largest Shift:
employees
Number of Parking Spaces:
Intended Building Use:
New Construction Area:
sq. ft.
Existing Construction Area:
sq. ft.
Renovations:
sq. ft.
Finished Office Area:
sq. ft.
Finished Production Area:
sq. ft.
Finished Warehouse Area:
sq. ft.
Total Building Area:
New and Existing
sq. ft.
Finished Building Dimensions:
Length:
ft.
Width:
ft.
Height:
ft.
Will
Aecon
obtain site plan approval?
Yes
No
Full Site Area:
acres
Will there be a mezzanine?
(open 2nd story in shop area)
Yes
No
Floor Load:
lbs.
Clear Height:
ft.
Above:
ft.
Below:
ft.
Shop Lighting Level:
Min
Reading
Inspection
Specialty
Special concrete floor finish:
None
Non-skid
Water and Oil Resistant
Hardened
Decorative/Specialty
Overhead crane required?
Yes
No
Span:
ft.
Capacity:
tons
Run:
ft.
Industrial Equipment:
To be installed or moved
Yes
No
Total Tonnage:
tons
Special Floor Features:
Pit
Foundation
Platform
Shaped
Office Space Finish Quality:
Economy
Durable
Commercial
Custom / Specialty
Number of Windows Desired:
windows
Average Windows Size:
sq. ft.
Will there be skylights?
Yes
No
Total Area of Skylights:
sq. ft.
Are Forklifts Used?
Anywhere in the building
Yes
No
Number of Lifts:
per day
Loaded Weight:
lbs.
Wheel Spacing:
ft.
Will there be racks?
In the production/warehouse space
Yes
No
Will they be supplied and installed by the owner?
Yes
No
Loading Cap:
lbs. per sq. ft.
Height:
ft.
Shelf Spacing - Vertical:
in.
Shelf Spacing - Horizontal:
in.
Loading Docks Required?
Yes
No
Number of Docks:
in.
Additional Requirements:
Levellers
Seals
ICC Restraints
Production/Warehouse Space Heated?
Yes
No
Heated Temp. Required:
Fahrenheit
Production/Warehouse Space Cooled?
Yes
No
Cooled Temp. Required:
Fahrenheit
Humidity Control Required?
Yes
No
Required Humidity:
% -
%
Electrical Power Required:
In total
Amps
Volts
Industrial Process Power Required?
Yes
No
Process Amps:
Amps
Process Volts:
Volts
About AECON
View AECON Projects
Download Case Studies
Estimate Your Project
Contact AECON
Home