* Required Fields
Name Of Company *
Contact Name *
Phone Number *
Email Address
SIC Code
When is your desired move-in date?
January
February
March
April
May
June
July
August
September
October
November
December
Month
2008
2009
2010
2011
2012
2013
Year
Where is the building to be located?
City
State/Province
Country
Check existing utilities located at site:
Water
Sewer
Electric
Gas
Telecom
Distance of building to road:
ft
Number of production/warehouse employees, all shifts:
Number working largest shift only:
Number of parking spaces required:
What is the end use of your building?
New construction area:
sq ft
Existing construction area:
sq ft
Renovations:
sq ft
Finished office/administration area:
sq ft
Finished production
sq ft
Finished warehouse area:
sq ft
Total completed building area (Wew and Existing):
sq ft
Finished Building Dimensions:
Length
ft
Width:
ft
Height:
ft
Will AECON obtain site plan approval?
Yes
No
What is the area of your site?
acres
Will there be a mezzanine
(open 2nd story in shop area)?
Yes
No
Floor Load:
lbs
Clear Height:
ft
Above:
ft
Below:
ft
Shop lighting level:
Min.
Reading
Inspection
Specialty
Special Concrete floor finish:
Yes
No
Nonskid
Water & Oil Resistant
Hardened
Decorative/Specialty
Is an overhead crane is required?
Yes
No
Span:
ft
Capacity:
Tons
Run:
ft
Is industrial equipment to be installed/moved?
Yes
No
Total Tonnage
Check special floor features:
pit
foundation
platform
shaped
Office space finish quality level of fixtures, hardware, paint and decor:
Economy
Durable
Commercial
Custom/specialty
Number of windows desired:
Average window size:
sq ft
Skylights:
Yes
No
Total square feet of Skylights
Are forklifts used in your building?
Yes
No
Number of Lifts:
Per Day
Loaded Weight:
lbs
Wheel Spacing:
feet
Will there be racks in the production/ Warehouse space?
Yes
No
Will these racks be supplied and installed by the owner?
Yes
No
Loading Cap:
per sq. ft.
Height:
ft.
Shelf Spacing
Vertical:
inch.
Horizontal:
inch.
Are loading docks required?
Yes
No
How many:
levellers
Seals
ICC Restraints
Is the production/warehouse space heated?
Yes
No
What heated tempurature is required?
ºF
Is the production/warehouse space cooled?
Yes
No
What cooled tempurature is required?
ºF
Is humidity control required?
Yes
No
Required humidity range:
% --
%
Total electrical power required:
Amps
Volts
Industrial process power required:
Yes
NoÂ
Process Amps:
Process Volts:
About AECON
View AECON Projects
Download Case Studies
Estimate Your Project
Contact AECON
Home